The challenge
A pre-engineered kit building still has to be erected true — steel frame alignment, weld quality on every connection, and a weathertight exterior all depend on the crew doing the erection, not just the kit manufacturer's design.
What we built
M&R Welding erected a 6,000 square foot metal building from a Mueller kit in Denton, TX — setting and welding the structural steel frame, then closing it in with the exterior panel system. The result is a building sized for real working space: equipment storage, shop floor, or a combination of both, built on a frame designed to carry it for decades.
Materials
Pre-engineered steel frame (Mueller kit); steel exterior panel system.